BergerABAM developed a double-decked prestressed marine concrete floating pier, also referred to as the modular hybrid pier, with a maintenance-free service life of 100 years and that is flexible in both function and location. This flexibility allows the capability to berth a range of Navy surface combatants with differing utility and access demands, and enables the Navy to move or reconfigure a pier as a naval base mission changes. Additionally, the pier’s mobility unique to the floating concept allows off-site pier construction, lowering the costs by accessing a larger, less geographical constrained construction market, and minimizing the construction disruptions to naval station operations.