Skip to main content

Cameron LNG Terminal

Cameron, Louisiana

The Cameron liquefied natural gas (LNG) terminal is designed to accommodate two 250,000-cubic-meter LNG bulk carriers. Initially designed using a generic cast-in-place concrete pile cap system, the unloading platforms at the terminal support the LNG loading arms and the crew pedestal. BergerABAM tailored the design of the two platforms by working closely in the early stages of design with the marine contractor to develop a framing system that optimized the use of the available heavy-lift equipment to provide additional savings to the client.

Services Provided by BergerABAM: 
  • Preaward Support
  • Preliminary Design
  • Detailed Design
  • Construction Submittal Review
Project Details: